BOBCAT S130 – HYDRAULIC CONTROL VALVE (ACS) OR (SJC) – Port Relief Valve Removal And Installation

Remove the port relief plug (Item 1) [Figure 20-41-42] from the auxiliary circuit of the control valve.

Installation: Always use new O-rings (Item 1) [Figure 20-41-43]. Lightly lubricate with oil and tighten to 38 – 45 ft.-lb. (52 – 61 Nโ€ขm) torque.

The control valve may be equipped with an optional auxiliary port relief valve (Item 1) [Figure 20-41-44].

Remove the auxiliary port relief valve.

Installation: Always use new O-rings (Item 1) [Figure 20-41-45]. Lightly lubricate with oil and tighten to 38 – 45 ft.-lb. (52 – 61 Nโ€ขm) torque.