BOBCAT S130 – CONTROL PEDALS AND LINKAGES – Linkage Removal And Installation

Remove the crossbar pivot bolt and washer (Item 1) [Figure 50-90-3].

Remove the bolt, washer and nut (Item 1) [Figure 50-90-4] to disconnect the lift pedal linkage from crossbar.

Remove the hairpin clip and cross-pin from the control valve lift spool (Item 1) [Figure 50-90-5].

Disconnect the crossbar from the control valve.

Remove the crossbar from the pivot [Figure 50-90-6].

Installation: Check the nylon bushing (Item 1) [Figure 50-90-6] for wear and replace as needed.

Remove the bolt and nut (Item 1) to disconnect the lift pedal linkage (Item 2) [Figure 50-90-7] from the pedal.

Installation: Tighten the bolt and nut to 25 – 28 ft.-lb. (34 – 38 Nโ€ขm) torque.

Remove the hairpin clip and cross-pin (Item 1) [Figure 50-90-8] to disconnect the tilt foot pedal linkage from the control valve.

Remove the bolt and nut (Item 1) to disconnect the tilt pedal linkage (Item 2) [Figure 50-90-9] from the pedal.
Installation: Tighten the bolt and nut to 25 – 28 ft.-lb. (34 – 38 Nโ€ขm) torque.