Start the engine. Raise the lift arms and install an approved lift arm support device. (See Installing on Page 10-20-1.)
Stop the engine.
Raise the operator cab. (See Raising on Page 10-30-2.)
Disconnect solenoid connector harness (Item 1) [Figure 20-110-5].
Disconnect tubelines (Item 1) [Figure 20-110-6] and [Figure 20-110-7] from the A, B, C, and D port.
Disconnect tubeline (Item 1) [Figure 20-110-8] at tee fitting below the Bucket Position Valve.
This line is connected to A port on bucket position valve.
Remove bucket position valve mounting bolts (Item 1) [Figure 20-110-9].
Remove the bucket position valve from the loader.