Remove the bucket. (See Operation & Maintenance Manual for correct removal procedure.
Support the boom with a hoist [Figure 40-200-1].
Remove the nuts (Item 1) and bolt (Item 2) [Figure 40-200-2].
Remove the pin (Item 1) [Figure 40-200-3].
Remove the nuts (Item 1) and bolt (Item 2) [Figure 40-200-4].
Remove the pin (Item 1) [Figure 40-200-5] and remove the X-ChangeTM from the arm.