Lower the work group to the ground.
With the engine off, turn the key to the ON position and move both hydraulic control levers to relieve hydraulic.
Remove the floor mat and floorplate. (See Removal And Installation on Page 40-110-1.)
Remove the tool box. (See Removal And Installation on Page 40-230-1.)
Disconnect the wire harness (Item 1) [Figure 20-210-1].
Mark all hoses for proper installation.
Remove the hoses (Item 1) [Figure 20-210-2].
Remove the nuts (Item 1) [Figure 20-210-3]. Remove the manifold.