Lower the work group to the ground.
With the engine off, turn the key to the ON position and move both hydraulic control levers to relieve hydraulic pressure.
Support the boom using a chain hoist [Figure 20-24-6].
Remove the nuts (Item 1) and bolt (Item 2) [Figure 20-24-7].
Remove the pin (Item 3) [Figure 20-24-7].
Remove the hose (Item 1) [Figure 20-24-8].
Remove the hose (Item 1) [Figure 20-24-9].
Remove the nuts (Item 1) and bolt (Item 2) [Figure 20-24-10].
Remove the hose clamp (Item 3) [Figure 20-24-10].
Remove the pin (Item 1) [Figure 20-24-11].
Remove the cylinder.