Remove the bucket. (See Operation & Maintenance Manual for correct removal procedure.)
Lower the clamp to the ground.
Remove the snap ring (Item 1) [Figure 40-180-1] and washers from the rod end of the clamp cylinder.
Remove the pin (Item 1) [Figure 40-180-2].
Remove the nuts and bolt (Item 1) [Figure 40-180-3].
Remove the pin (Item 1) and clamp (Item 2) [Figure 40-180-4].