Remove the bucket or attachment. (See the Operation and Maintenance Manual for the correct procedure.)
Fully retract the arm and install the pin (Item 1). Install the retainer (Item 2) [Figure 40-161-1] on both sides of the pin.
Remove the X-Change. (See Removal And Installation on Page 40-200-1.) or (See Removal And Installation on Page 40-201-1.)
Remove the bucket cylinder. (See Removal And Installation on Page 20-24-3.).
NOTE: Do Not remove the bucket link pin (Item 1) [Figure 40-161-2] at this time. The pin is also
the extendable cylinder rod end pin.
Remove the arm cylinder. (See Removal And Installation on Page 20-22-3.)
Support the arm with a chain hoist (Item 1) [Figure 40-161-3].
Remove the bucket cylinder hoses (Item 1) from both sides of the arm. Remove the X-Change hoses (If
equipped) (Item 2) [Figure 40-161-4] from both sides of the arm.
Disconnect the hoses (Item 3) [Figure 40-161-4] from the quick couplers. Remove the hoses from the bulkhead fittings.
Remove the nuts (Item 1) and bolt (Item 2) [Figure 40-161-5].
Remove the pin (Item 3) [Figure 40-161-5] and remove the arm from the boom.