Remove the operator cab stop (Item 1) (both sides) [Figure 50-20-1].
Remove the cab nut and hold down plate (Item 1) [Figure 50-20-2] (both sides).
Installation: Tighten the nut to 40-50 ft.-lbs. (54-68 Nm) torque.
Install a strap (Item 1) [Figure 50-20-3] to the cab handles to prevent the cab from falling forward.
Raise the operator cab (See Raising The Operator Cab on Page 10-30-1.), to release the tension on the gas
cylinder.
Remove the retaining pin(s) (Item 1) [Figure 50-20-4] and [Figure 50-20-5] from the top pivot pin(s).
Remove the retaining pin(s) (Item 1) [Figure 50-20-6] and [Figure 50-20-7] from the bottom pivot pin(s).
Remove the gas cylinder(s) (Item 2) [Figure 50-20-6] and [Figure 50-20-7] from the operator cab.
Reverse the above procedure to install the gas cylinders onto the operator cab.